- At least four taps. I expect to have several brews going at once, plus a soda tap for the kids from time to time.
- Two different CO2 pressures so that I can carbonate at high pressure and serve at low pressure at the same time.
- It needs to be portable since I cannot dedicate a specific place in my home to this thing.
- It should be easy to build. I don't have the skills nor time to take on an epic woodworking project. Anyone with basic DIY skills can build this project. Really.
- It should not be ugly. I want to be able to have this in my living room without being embarrassed. You be the judge.
So let's start at the end with the finished project. Here's a closeup of the collar and taps.
Next picture shows the front of the kegerator including the casters.
I decided to base the kegerator on a brand new Frigidaire 7.2 cu ft chest freezer from Lowe's. This saved a lot of time by not having to restore an older beat-up freezer, and this model is reasonably priced.
Oh yes, before I get comments on the low serving temperature, I was actually not serving beer when these pictures were taken, but cold-crashing a fermenter before kegging.



I built the collar on top of the freezer so that I could check that everything lined up. The boards are Western Hemlock 2x8, thinned down to 1.25" thickness on a table saw. The lid seal is one inch wide so I provide an equally wide area on top of the collar for it to seat against. I made an additional allowance of 0.25" for the round-over already present on the outside of the board. This allows enough width for the seal to completely seat, and it maximizes the thickness of the foam boards I can put inside the collar.
I predrilled holes and used finishing nails to hold the mitered boards together. This helps prevent something slipping as I assemble it. I found out the hard way not to spackle the nail heads. The area touched by spackling will absorb stain differently than the surroundings, even though it is invisible before staining. I had to spot sand around the nail heads and restain to fix it.


Wiring
I ran an electrical cable from the temperature controller site, around the corner and towards the back of the collar. Cable clips hold the cable in place.
The Love controller provides switched power on the green wire which is connected by a yellow wire nut to the compressor and to the last prong on the wall bug. This allows the fan to run when the compressor runs, and stop when the compressor stops. I like this rather than having it run all the time because the electrical energy given to the fan is dissipated as heat inside the kegerator, making it less efficient.

I keep a partially filled glass of water in the fridge for the temperature sensor. This helps to slow down fast temperature fluctuations as I open the lid or the fan starting. If we have too much water in the glass it slows down the controller's response to temperature change too much and it will undershoot the set temperature.
Foam Panels
By thinning the collar to 1.25" I could fit 1.5" thick pink foam board inside the collar and still not encroach on the available space under the collar. In other words, the foam boards are almost flush with the inside freezer walls. The first picture shows the front foam board with cutouts for the faucets, the temperature controller, and its wiring. I also notched out spaces for the cleats to fit in. One brass nut from the faucets is test fitted in the hole for size.
Attaching CO2 Bottle
There is limited space inside the kegerator so I wanted to mount the CO2 bottle and regulators on the back wall. The CO2 bottle hanger is built from .125" thick steel bar stock using a stick welder. It has the form of the letter 'T', where the upper crossbar is attached to the collar with wood screws. I needed to use two layers of steel bar to build up enough height to get passed the plastic frame between the freezer body and collar. The bottom part of the hanger is bent up slightly more than 90 degrees to reach into the shallow recess on the underside of the bottle. The bottle hanger has two buckles that I pass a web strap through and hold the bottle securely in place. On the right you can see the power and fan cables attached to the wall by adhesive cable tie anchors.
Shown right is how the CO2 bottle is held in place with the web strap down low and with a metal clamp, made from plumbers strap, up high.
The CO2 bottle and the regulators are held in place by clamps, supported by eye lag screws. Eye lag screws are hard to find. At McLendons they knew what I wanted but they stopped carrying these some time back. At Home Depot they did not know what I was talking about. I ended up ordering a pack of 20 online at the Amazon marketplace, from ANTOnline.
Build of Materials
Major components:- Frigidaire 7.2 cu ft chest freezer, black, from Lowes
- 2x8 western hemlock lumber (HemFir), Home Depot
- Zinsser wood stain Cabernet, Lowes (I cannot find it anymore)
- Minwax polyurethane, clear semi-gloss, Lowes
- 3" polyurethane rigid caster, Harbor Freight Tools
- 3" Polyurethane swivel caster with lock, Harbor Freight Tools
- 2 keg kegerator kit with dual regulator, 5# CO2 tank, hoses w. disconnects, Kegconnection's Ebay store
- 4-way CO2 gas distribution manifold, HomeBrewStuff.com
- 2-way CO2 gas distribution manifold, HomeBrewStuff.com
- Love Temperature controller, TSX-10140, Dwyer Instruments, Inc.
- Masscool 120mm computer fan, MP3SuperStore on Ebay
- Perlick Perl Forward Sealing Faucet (525SS), Austin Homebrew Supply
- 3" stainless steel beer shanks, brauman59 on Ebay
- Starr bottle opener "Home Brewed" with clear bottle cap catcher, Kegconnection's Ebay store
- 19.25" Stainless steel drip tray, Ebay
- 1.5" Rigid foamboard panels, Home Depot
- PL300 Foamboard adhesive, Home Depot
[Back To Blog]